    环氧自流平施工前对基面有什么要求?
    来源:http://www.jndmzp.com   时间:2020-7-23 14:00:45
    大家都知道现在想要保护某些特殊的公共场所的地面不受到损坏,一般都会给地面进行环氧自流平的施工,但是这个施工不是直接进行的,在施工前对需要施工的地面是有要求的,具体的要求在下面的文章为大家详细介绍。下面就随济南自流平小编来详细了解一下吧,希望对大家有帮助。
    We all know that now we want to protect the ground of some special public places from damage. Generally, we will carry out the construction of epoxy self leveling on the ground, but this construction is not carried out directly. Before the construction, there are requirements for the ground to be constructed. The specific requirements are introduced in detail in the following article. The following with Jinan self leveling small to learn more about it, I hope to help you.
    在环氧自流平施工前基面的要求如下:
    Before the construction of epoxy self leveling, the requirements of base surface are as follows:
    1、水泥基面牢固、结实、不起壳,杜绝砂浆起壳现象,尽量好混凝土层与砂浆找平层一起浇注。如果先捣混凝土层,则要求砂浆层的厚度不低于4cm,叉车道则要求更厚一些。
    1. The cement base surface shall be firm, firm and free from shell, and the phenomenon of mortar shell rising shall be eliminated. The concrete layer and mortar leveling layer shall be poured together as much as possible. If the concrete layer is rammed first, the thickness of mortar layer is required to be no less than 4cm, and the thickness of forklift road is required to be thicker.
    2、要求表面不起砂,硬度好,没有水泥粉化现象。要求:A、优良水泥。 B、新倒水泥砂浆层要充分保养。
    2. The surface should be free from sand, with good hardness and no cement pulverization. Requirements: A. excellent cement. B. The newly poured cement mortar layer shall be fully maintained.
    3、水泥基面平坦、无凸凹不平、蜂窝麻面、水泥疙瘩。

    3. The cement base surface is flat without uneven surface, honeycomb and pockmarked surface and cement pimple.

    4、要求地面平整性不大于涂装要求厚度(用3米直尺平靠)。
    4. It is required that the flatness of the ground shall not be greater than the thickness required by the coating (use a 3M ruler for leveling).
    5、表面干燥,含水量小于6,保持地面干燥无油污,切记水泥地面保养期过后进场施工前5天,不能用水冲洗或拖把拖地。
    5. The surface shall be dry with water content less than 6, and the ground shall be kept dry and free of oil stain. It is important to remember that after the maintenance period of cement floor, it is not allowed to wash with water or mop the floor 5 days before entering the construction site.
    6、地坪表面的PH值应在6.0~8.0。
    6. The pH value of the floor surface should be 6.0 ~ 8.0.
    7、地面无油污、其他油漆、乳胶漆、泡泡糖等残渣。
    7. The ground shall be free of oil, other paint, latex paint, bubble gum and other residues.
    坡度应符合设计要求,允许偏差值为坡度的2%,并且不大于30mm。
    The slope shall meet the design requirements, and the allowable deviation is 2% of the slope and shall not be greater than 30mm.
    以上还是关环氧自流平施工基面的相关内容介绍,希望对你们有所帮助,想要了解更多内容欢迎点击济南自流平http://www.jndmzp.com官网。
    The above or about the epoxy self leveling construction base surface related content introduction, hope to help you, want to know more content, welcome to click Jinan self leveling http://www.jndmzp.com Official website.