    工业地坪济南自流平标准及处理办法
    来源:http://www.jndmzp.com   时间:2013-9-28 11:19:26
    (1)先掌握了解要涂装的工件大小和数量。
         the first known to coating workpiece size and number.
    (2)根据工件表面锈蚀、油污程度,计算出每个工件表面处理所需的基本工时。
         according to the workpiece surface rust, oil level, calculate the basic working hours for each workpiece surface treatment for the.
    (3)根据济南自流平涂装质量等级要求,确定工件刮腻子层数、打磨次数和喷面漆层数所需的工时总和。
         according to the Ji'nan self quality grade flat painting requirements, determine the time of workpiece layers, putty sanding times and spray paint layers required sum.
    (4)确定济南自流平腻子、底漆、面漆采取什么样干燥方式和是否采用“湿碰湿”工艺(不推荐采用,以自然干燥为佳),计算出干燥时间所需的辅助工时
         determine the Ji'nan self leveling putty, primer, topcoat adopts what kind of drying methods and whether to adopt the "wet on wet" process (not recommended, with natural drying is better), compute aided time required for drying time
    (5)根据济南自流平 http://www.jndmzp.com/ 工件大小和数量,确定单人操作或集体操作,掌握单件和数量少的工件,单人操作和集体操作的不同条件所需工时。一般大批量的工件可适当减少2%~5%的工时。
         according to the Ji'nan self leveling the workpiece size and number, to determine the single operation or collective operation, master piece and a small number of workpiece, the different conditions of single operation and collective operations required for hours. The general mass of the workpiece can be properly reduced 2%~5% hours.
    (6)对于济南自流平定型批量生产以流水作业方式施工,可按照分工程度来估算工时。根据各工序繁简程度,估算出工时,后再加特殊临时消耗5%~8%补偿工时,即为一批产品所需的总工时量。
          for Ji'nan gravity Pingding type batch production to shop construction, according to the degree of division of labor to estimate time. According to the process complexity, estimate the time, eventually adding special temporary consumption 5%~8% compensation time, for a number of products the total amount of work required.