    济南地面找平施工工艺、流程
    来源:http://www.jndmzp.com   时间:2014-12-31 8:46:56
    1、地面找平的规范程序:
    1, ground leveling the specification of the program: 
    基层处理→找标高、弹线→洒水湿润→抹灰饼和标筋→搅拌砂浆→刷水泥浆结合层→铺水泥砂浆面层→木抹子搓平→铁抹子压遍→第二遍压光→第三遍压光→养护
    Basic level processing to find elevation, spring wire, sprinkler and humid plaster brush the bread and the reinforcement - mixing mortar - water mud to cement mortar layer, combining layer wood float iron float shall be laid flat - pressure first, second, to third time pressure light, light curing 
    2、将基层上的灰尘扫掉,用钢丝刷和錾子刷净、剔掉灰浆皮和灰渣层,用10%的火碱水溶液刷掉基层上的油污,并用清水及时将碱液冲净。
    2, will sweep the dust at the grass-roots level off, brush with wire brush and chisel net, shave my skin and ash mortar layer, with 10% sodium hydroxide solution is brushed off base on the oil, and water in a timely manner to lye rinse. 
    3、根据墙上的+1000mm水平线,往下量测出面层标高,并弹在墙上。
    3, according to the + 1000 mm horizontal line on the wall, downwards of surface elevation, and play on the wall. 
    4、根据房间内四周墙上弹的面层标高水平线,确定面层抹灰厚度(不应小于20mm),然后拉水平线开始抹灰饼(5cm*5cm),横竖间距为1.5—2.0米,灰饼上平面即为地面面层标高。如果房间比较大,还须抹标筋。铺抹灰饼和标筋的砂浆材料配合比均与抹地面的砂浆相同。
    4, according to the room around the wall of surface elevation, horizontal determine the thickness of surface rendering (should not be less than 20 mm), and then pull a horizontal start rendering cake (5 cm * 5 cm), namely spacing is 1.5-1.5 meters, ash cake on the plane to ground surface elevation. If the room is bigger, still must wipe the reinforcement. Spread plaster the bread and the reinforcement of mortar and ground mortar material mixing ratio in the same way. 
    5、搅拌砂浆,用搅拌机进行搅拌,颜色必须一致。
    5, mixing mortar, using blender mixing, color must be consistent. 
    6、铺设水泥砂浆前,涂刷水泥浆一层(随刷随铺面层砂浆)。
    6, laid before the cement mortar, besmear brushs water mud layer (layer with the brush with the pavement mortar). 
    7、在涂刷完水泥砂浆后,铺水泥砂浆,并在灰饼之间将砂浆铺均匀。
    After 7, in besmear to brush the cement mortar, cement mortar, and then spreads out the mortar between ash cake evenly. 
    8、木抹子刮平后,迅速用铁抹子压遍,直到出浆为止。面层砂浆初凝后,用铁抹子压第二遍,表面压平压光。在水泥砂浆终凝前进行第三遍压光,必须在终凝前完成。 并随时用2米靠尺检查其平整度。
    8, wood float after leveling, quickly use iron float pressure for the first time, until the slurry. After the initial setting, surface mortar iron float shall be used to pressure the second time, surface pressure flat light. Before the final set cement mortar for third time calender, must be completed before the final set. And feel free to check the flatness with 2 meters by ruler. 
    9、完工后24小时(地面压光),铺锯末或其他材料覆盖洒水养护,保持湿润,养护时间不少于7天,抗压强度达5Mpa时才能上人。
    9, 24 hours after completion of calender (ground), with sawdust or other material to cover water curing, moist, curing time of not less than 7 days, the compressive strength of 5 mpa to here. 