    地面水泥沙浆找平各种指标标准
    来源:http://www.jndmzp.com   时间:2016-12-22 16:45:15
    弹找平控制线——做找平面标高泥饼——水泥浆结合层——封堵门口——对室内设施根部包扎或隔挡保护 —— 水泥砂浆满铺——表面压光——淋水保护
    Play the leveling line - do find the plane elevation of mud cake - cement slurry with layer - plugging door barrier protection - cement mortar covered with surface pressure light - water protection of indoor facilities or root dressing
    1 弹找平控制线:依据地面铺贴饰材的种类厚度和完成面标准线确定找平厚度,在墙面弹出找平控制线。
    The 1 bomb leveling line: leveling thickness determined according to different thickness of paving the ground decorating material and finish the standard line on the wall, pop-up leveling line.
    2 做找平面标高泥饼:依据找平控制线沿墙四周作出泥饼,并拉线按两边灰饼高度作出中间灰饼,灰饼间距不大于1500㎜。
    2 do find the plane elevation cake: Based on the leveling line along the wall around to make mud cake, and pull on both sides of ash cake made by high ash ash cake cake, the spacing is not greater than 1500 mm.
    3 水泥浆结合层:按1:0.5的比例配制素水泥浆,用扫帚扫涂地面,形成结合层。
    3 cement paste bonding layer: according to the proportion of 1:0.5 cement slurry, broom sweep the ground, forming a bonding layer.
    4 对室内设施根部包扎或隔挡保护:对已完成的木制品的根部包扎,对室内原有设施的根部包扎或用材料进行隔挡。
    4 the root of the indoor facilities or block protection: the root of the finished wood products, the root of the original facilities in the indoor dressing or material blocking.
    5 水泥砂浆满铺:水泥砂浆配合比为水泥:砂=1:2,应搅拌均匀。满铺水泥砂浆后用长木杠拍实搓平,使砂浆与基层结合密实。
    5 cement mortar full shop: cement mortar mix for cement: sand =1:2, should be mixed evenly. Full shop cement mortar with long wood bar pat rub flat, make mortar and grassroots dense combination.
    6 表面压光:表面压光分两次进行。次在水泥砂浆凝结稍有反水,人踩上去有脚印,但不下陷时,撒干水泥面后用铁抹子压光,从边角到大面,顺序加力压实抹光,待水泥砂浆终凝前进行第二遍压光,用铁抹子将次压光留下的抹纹压平、压实、压光。
    6 surface pressure: surface pressure light two times. The first time in the cement mortar setting slightly defected, people step up a step, but does not sink, then dry cement with iron float pressure light, from the corner to the surface, wipe compaction to order afterburner, cement mortar before the final setting of second times of light pressure, with iron float for the first time pressure leave the light with grain planish, compaction, pressure light.
    7 淋水养护:面层压光24小时后,面层覆盖吸水材料,每天淋水不少于2次,保持覆盖材料潮湿,养护时间不少于7天。
    7 shower maintenance: face laminated light 24 hours later, the surface layer of water absorbing material, not less than 2 times a day drench water, keep the cover material moisture, curing time of not less than 7 days.