    家装地上找平办法和标准:
    来源:http://www.jndmzp.com   时间:2018-8-14 11:29:11
    1.水泥砂浆面层与底层应粘结结实,不该空鼓。
    1. cement mortar surface and bottom should be bonded solid, should not be empty drum.
    2.水泥砂浆面层外表应密实压光,不答应有裂缝,脱皮、起沙、接荐不平等缺点。
    2. The surface of cement mortar should be compact and smooth, no cracks, peeling, sand, recommendation unequal shortcomings.
    3.不泛水的地上,应按设计要求做好泛水,不得有倒泛水现象。
    3. if the water is not flashing, the water should be well designed according to the design requirements.
    4.用2m靠尺查看外表平整度,答应差错4mm。
    4. use 2m to check the appearance smoothness by the ruler, and promise the error 4mm.
    5.两米内差错小于3毫米(大不行超越5毫米)
    5. error within two meters is less than 3 mm (maximum not exceeding 5 mm).
    6.地上无起沙、起空、掉落现象。

    6. there is no sand, empties and falls.

    济南地面找平

    7.地上施工后无异味。
    7. no smell is found after construction.
    8.地上色泽匀净、无失常颜色。
    8., the ground is clean and uniform with no abnormal color.
    9.地上无裂缝(原始地上翻砂严峻会呈现少数细微裂纹,但不行影响平整度)。
    9. there is no crack on the ground (the original ground sand casting is severe and presents a few tiny cracks, but it does not affect smoothness).
    10.先将底层上的尘埃扫掉,用钢丝刷和錾子刷净、剔掉灰浆皮和灰渣层,用10%的火碱水溶液刷掉底层上的油污,并用清水及时将碱液冲净。
    10. Scavenge the dust from the bottom layer first, brush with steel wire brush and chips, remove the plaster skin and ash layer, and remove the oil stain from the bottom layer with 10% caustic soda solution, and wash the alkali solution with clean water in time.
    11.依据墙上的1米水平线,往下量测出面层标高,并弹在墙上。
    11. according to the 1 meter horizontal line on the wall, measure the surface elevation and measure it on the wall.